matos vue en afghanistan
Page 1 sur 1
matos vue en afghanistan
charge non creuse pour faire un......trou individuel de combat technologie de la guerre froide.
https://i.servimg.com/u/f77/14/16/37/49/kz_oz110.gifhttps://i.servimg.com/u/f77/14/16/37/49/010810.jpghttps://i.servimg.com/u/f77/14/16/37/49/95052210.jpghttps://i.servimg.com/u/f77/14/16/37/49/kz_oz_10.jpghttps://i.servimg.com/u/f77/14/16/37/49/kz_oz_11.jpghttps://i.servimg.com/u/f77/14/16/37/49/oz101010.jpg[left]
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------OZ-1 FOXHOLE CHARGE
Designed to dig one-man foxholes (pits) in frozen and hard soils by a blasting method. The OZ-1 charges can also be used to loosen frozen and
hard soils, prior to the dig- ging of foxholes for two or three men, preparing cuts for armoured equipment, as well as building shel- ters for personnel and transport vehicles.
Basic Characteristics
Weight, kg:
charge assembly 3.5
Individual elements:
shaped charge 1.26 shaped charge filler 0.45
HE charge with rocket motor 1.45
HE charge filler 0.65
Overall dimensions when prepared for use, mm:
height 900 base diameter 420
Time required to prepare the charge for use, min 3
Operating temperature range, °C ±50
https://i.servimg.com/u/f77/14/16/37/49/kz_oz110.gifhttps://i.servimg.com/u/f77/14/16/37/49/010810.jpghttps://i.servimg.com/u/f77/14/16/37/49/95052210.jpghttps://i.servimg.com/u/f77/14/16/37/49/kz_oz_10.jpghttps://i.servimg.com/u/f77/14/16/37/49/kz_oz_11.jpghttps://i.servimg.com/u/f77/14/16/37/49/oz101010.jpg[left]
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------OZ-1 FOXHOLE CHARGE
Designed to dig one-man foxholes (pits) in frozen and hard soils by a blasting method. The OZ-1 charges can also be used to loosen frozen and
hard soils, prior to the dig- ging of foxholes for two or three men, preparing cuts for armoured equipment, as well as building shel- ters for personnel and transport vehicles.
Basic Characteristics
Weight, kg:
charge assembly 3.5
Individual elements:
shaped charge 1.26 shaped charge filler 0.45
HE charge with rocket motor 1.45
HE charge filler 0.65
Overall dimensions when prepared for use, mm:
height 900 base diameter 420
Time required to prepare the charge for use, min 3
Operating temperature range, °C ±50
Sujets similaires
» Afghanistan - French Army In Heavy Firefight During Intense Clashes With Taliban In Afghanistan
» le 07 aout 2011, décès du caporal Kisan Bahadur THAPA en Afghanistan ( 72 ° morts en Afghanistan )
» le 07 aout 2012 , en Afghanistan : un militaire français tué lors d’un accrochage en Kapisa (88° deces en Afghanistan )
» -13 juillet 2011 -Cinq soldats français tués en Afghanistan de la brigade la fayette -69° morts en Afghanistan
» Afghanistan : un militaire décède en France des suites de ses blessures ( A ce jour, 83 soldats français sont morts en Afghanistan)27 mars 2012 - capitaine Christophe SCHNETTERLE - 93e RAM
» le 07 aout 2011, décès du caporal Kisan Bahadur THAPA en Afghanistan ( 72 ° morts en Afghanistan )
» le 07 aout 2012 , en Afghanistan : un militaire français tué lors d’un accrochage en Kapisa (88° deces en Afghanistan )
» -13 juillet 2011 -Cinq soldats français tués en Afghanistan de la brigade la fayette -69° morts en Afghanistan
» Afghanistan : un militaire décède en France des suites de ses blessures ( A ce jour, 83 soldats français sont morts en Afghanistan)27 mars 2012 - capitaine Christophe SCHNETTERLE - 93e RAM
Page 1 sur 1
Permission de ce forum:
Vous ne pouvez pas répondre aux sujets dans ce forum